Weeks Group

What We've Done

Pursuit Development - South Florida Market, Atlanta GA, Chicago IL, Development Management Services for single site and strip retail projects from 10,000SF to 30,000SF.  Weeks Group has enjoyed a long -term relationship with Pursuit Development and has functioned as the Development Management / Construction management branch of Pursuit Development for over eight years. Pursuit has relied on our input from the very beginning of the site selection process through the project close out.

MedImmune, Inc. – Gaithersburg, MD – Facilities Management Support

Owner’s Representation / full-time support on site to supplement the existing Facilities staff with the completion and close out of multiple 2010 & 2011 funded projects.  Projects varied greatly from remodeling three office spaces to completing the interior renovations of office 30,000 SF of office space to assisting with procurement and proposals on validated systems.

Servcorp – Atlanta & Miami –Three Class A interior build outs ranging from 3500 to 6500 SF Owner's representation, for virtual office locations each having a $650,000 to $800,000 construction budget.  One of the two Atlanta projects that was completed was the US Corporate Headquarters for Servcorp

Verizon - Adamo, Tampa Market - 250,000 SF Logistics Warehousing Center
Owner's representation, $18,750,00 shell construction budget, $575,000 interior build out construction budget

Verizon - Kennedy, Tampa Market - 80,000 SF to 20,000 Call Center Operations Consolidation.  Owner's representation, construction build out - personnel relocation - $300,000 construction budget

Verizon - Causeway, Tampa Market - 20,000 SF Training Center Re-Stack, Interior Remodel, Land Divestment
Owner's representation, construction build out - site construction $4,200,000 construction budget

Atlas Air, Miami FL:  Project management, construction management and facilities management services provided for the 70,000 sf. Atlas Air Employee Training Center. Project includes day to day facilities management as well as the addition of three 747 Simulators.

American Red Cross, Miami FL: Project management construction management for the relocation of the South Florida headquarters.  Project includes 35,000 sf. Office and classroom facility with 15,000 sf. warehouse / emergency response area and a state of the art aquatics center.  Specific challenges of this project included designing the structure to be fully functional for day to day operations as well as functioning as a base of operations during a disaster.  The structure is designed to meet category five hurricane standards and to be completely self sufficient in times of disaster. Our involvement with the project completed with the design management and space programming phase.

Don King Productions, Deerfield Beach FL:  Provided Consulting Services and Project Costing Services to help settle multiple insurance claims at multiple locations due to hurricane damage.

Digitas, Miami FL: Construction management services provided for the relocation of existing 15,000 square foot office to new penthouse offices in Downtown Miami.  Project includes class “A” finishes in elevator lobby, reception area, board rooms, and conference rooms. A new server room with precision electrical and mechanical systems for 24-hour operation is incorporated in the project.  The project schedule was phased to allow early occupancy.

GetThere.com, Sunrise, FL: Project Management for 27,000 square foot call center to include redundant mechanical and electrical systems. Analysis of existing building systems performed to develop project criteria.

Geva I Corporation, Hollywood, FL: Provided full development management services from site selection through issuance of the certificate of occupancy for an independently owned and operated Mobil service station with convenience store and car wash. 

Gilat-To-Home, Sunrise, FL: Construction management services for 60,000 square foot facility.  Facility to incorporate a network operations center, server room, satellite field, and backup UPS and generator systems.

Mobil Oil OTR Program, Boca Raton, FL: Preferred vendor program consisting of the development of multiple site locations throughout South Florida from site selection to project close out. Preparation of preliminary budgets and feasibility studies on properties identified as potential sites.  Creation of master schedules. Coordination and management of all contractors, vendors and equipment.  Project schedule and budget tracking and reporting. This program maintained a budget of 12.5 million/year over a 30-month duration.

Dolphin Petroleum, Fort Pierce, FL: Provided full development management services from site selection through issuance of the certificate of occupancy for an independently owned and operated ExxonMobil service station with convenience store and car wash


Web Hosting Companies